Zachary Scott Theater
- Owner: Zachary Scott Theatre Center
- Structural Engineer: Structures
- General Contractor: JE Dunn Construction
- Contract Amount: $301,462
Project consisted of driving 228 – 8-5/8” OD pipe piles that ranged from 39 to 61 feet due to an excavated pit for the theatre’s trap. A 20 foot wall of 25 foot long, 6 gauge sheet piles supported by 12-3/4” OD pipe piles and tied back to 8-5/8” OD pipe deadmen was constructed to allow for temporary support of a heritage oak adjacent to excavated pit.